Agency of Natural Resources
Vermont.gov
Vermont.gov
home
projects
datasets
staff
LogOut
Projects List
Phase 1
Background
Themes
SGAT Upload
Trib Names
Exclude Reaches
Data Entry
FIT upload
Reports
Data Export
Phase 2
Exports
Home
>
Projects List
>
Phase 1
>
Reports
User Name:
*
Password:
*
Pike River
Phase 1 Reports
Report Name
[ select a report ]
Step 0 - Project Metadata
Step 0 - SGAT Notes
Step 0 - Data Entry Worksheet
Step 1 - Reach Locations (shows excluded reaches)
Step 2 - Preliminary Reference Stream Type
Step 3 - Geology
Step 3 - Soils Summary
Step 3 - Soils Data
Step 4 - Land Cover - Reach Hydrology
Step 4 - Watershed Land Cover - Land Use Data
Step 4 - Corridor Land Cover - Land Use Data
Step 4 - Riparian Condition Summary
Step 5 - Instream Channel Modification
Step 5 - Bank Armoring and Straightening (RIT or FIT data)
Step 6 - Floodplain Modification and Planform Changes
Step 6 - Berms and Roads (RIT or FIT data)
Step 7 - Bed and Bank Windshield Survey
Step 7 - Comments
Step 7 - Channelization Report
Step 8 - Stream and Watershed Impact Rating
Step 8 - Summary of Categorical Impact Scores
Step 8 - Downstream to Upstream Impact Graph
Step 8 - Reach Summary Report
Step 9 - Adjustment Process and Reach Condition
Step 9 - Reach Adjustment Process Report
Step 10 - Like Reach Evaluation
Vermont Department of Environmental Conservation
•
Watershed Management Division
Main Building - 2nd Floor
•
One National Life Drive
•
Montpelier, VT 05620-3522
SGA Map Site
|
VT Online Bridge & Culvert Tool
|
Contact & Help
|
Policies
|
Accessibility
|
A Vermont Government Website Copyright 2008 State of Vermont