M01-0 | 2 | Bridge or Culvert | | | 123.36 | Length | 0 | ----- | 0 |
M01-0 | 2 | Erosion | | Right Bank | 430.29 | Height | 3 | ----- | 0 |
M01-0 | 2 | Grade Control | Ledge | Upstream | 0 | Height | 2 | HtAbvWater | 2 |
M01-0 | 2 | Mass Failure | | | 0 | Height | 9 | ----- | 0 |
M01-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M01-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M01-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
M02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 51.06 | ----- | 0 | ----- | 0 |
M02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 57.09 | ----- | 0 | ----- | 0 |
M02-0 | 2 | Bridge or Culvert | | | 71.3 | Length | 0 | ----- | 0 |
M02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M02-0 | 2 | Development | | One Side | 156.53 | ----- | 0 | ----- | 0 |
M02-0 | 2 | Development | | One Side | 188.09 | ----- | 0 | ----- | 0 |
M02-0 | 2 | Grade Control | Waterfall | Downstream | 0 | Height | 15 | HtAbvWater | 15 |
M02-0 | 2 | Grade Control | Waterfall | Downstream | 0 | Height | 10 | HtAbvWater | 10 |
M02-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M02-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M03-0 | 2 | Development | | One Side | 260.84 | ----- | 0 | ----- | 0 |
M03-0 | 2 | Mass Failure | | | 0 | Height | 20 | ----- | 0 |
M03-0 | 2 | Mass Failure | | | 0 | Height | 20 | ----- | 0 |
M03-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
M03-0 | 2 | Stormwater Input | | | 0 | ----- | 0 | ----- | 0 |
M03-0 | 2 | Stormwater Input | | | 0 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Grade Control | Dam | Mid-Segment | 0 | Height | 5 | HtAbvWater | 3 |
M04-0 | 2 | Grade Control | Ledge | Upstream | 0 | Height | 7 | HtAbvWater | 5 |
M04-0 | 2 | Grade Control | Waterfall | Mid-Segment | 0 | Height | 12 | HtAbvWater | 18 |
M04-0 | 2 | Grade Control | Waterfall | Upstream | 0 | Height | 22 | HtAbvWater | 14 |
M04-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M05-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M05-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M05-A | 2 | Mass Failure | | | 0 | Height | 20 | ----- | 0 |
M05-A | 2 | Mass Failure | | | 0 | Height | 40 | ----- | 0 |
M05-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M05-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M05-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M05-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
M05-C | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 48.94 | ----- | 0 | ----- | 0 |
M05-C | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 41.26 | ----- | 0 | ----- | 0 |
M05-C | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 139.4 | ----- | 0 | ----- | 0 |
M05-C | 2 | Bridge or Culvert | | | 54.22 | Length | 60 | ----- | 0 |
M05-C | 2 | Bridge or Culvert | | | 91.06 | Length | 0 | ----- | 0 |
M05-C | 2 | Grade Control | Weir | Mid-Segment | 0 | Height | 0 | HtAbvWater | 0 |
M05-C | 2 | Stormwater Input | | | 0 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 60.21 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 110.78 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Bridge or Culvert | | | 85.9 | Length | 0 | ----- | 0 |
M06-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Development | | One Side | 168.54 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Erosion | | Left Bank | 211.38 | Height | 4 | ----- | 0 |
M06-0 | 2 | Erosion | | Left Bank | 310.26 | Height | 0 | ----- | 0 |
M06-0 | 2 | Mass Failure | | | 0 | Height | 6 | ----- | 0 |
M06-0 | 2 | Mass Failure | | | 0 | Height | 75 | ----- | 0 |
M06-0 | 2 | Mass Failure | | | 0 | Height | 25 | ----- | 0 |
M06-0 | 2 | Mass Failure | | | 0 | Height | 30 | ----- | 0 |
M06-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
M07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M07-0 | 2 | Grade Control | Waterfall | Mid-Segment | 0 | Height | 30 | HtAbvWater | 30 |
M07-0 | 2 | Mass Failure | | | 0 | Height | 10 | ----- | 0 |
M07-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M07-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M07-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
M07-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
M07-0 | 2 | Stormwater Input | | | 0 | ----- | 0 | ----- | 0 |
M07-0 | 2 | Stormwater Input | | | 0 | ----- | 0 | ----- | 0 |
M08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 98.59 | ----- | 0 | ----- | 0 |
M08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 109.77 | ----- | 0 | ----- | 0 |
M08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 54.39 | ----- | 0 | ----- | 0 |
M08-0 | 2 | Beaver Dam | | | 0 | Length | 100 | ----- | 0 |
M08-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M08-0 | 2 | Development | | One Side | 186.16 | ----- | 0 | ----- | 0 |
M08-0 | 2 | Straightening | Straightening | | 48.27 | ----- | 0 | ----- | 0 |
M08-0 | 2 | Straightening | Straightening | | 679.45 | ----- | 0 | ----- | 0 |
M09-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 52.69 | ----- | 0 | ----- | 0 |
M09-0 | 2 | Beaver Dam | | | 0 | Length | 600 | ----- | 0 |
M09-0 | 2 | Bridge or Culvert | | | 47.77 | Length | 0 | ----- | 0 |
M09-0 | 2 | Encroachment | Berm | One Side | 243.89 | ----- | 0 | ----- | 0 |
M09-0 | 2 | Encroachment | Road | One Side | 217.35 | ----- | 0 | ----- | 0 |
M09-0 | 2 | Erosion | | Right Bank | 67.81 | Height | 4 | ----- | 0 |
M09-0 | 2 | Straightening | Straightening | | 245.89 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Beaver Dam | | | 0 | Length | 100 | ----- | 0 |
M10-0 | 2 | Beaver Dam | | | 0 | Length | 0 | ----- | 0 |
M10-0 | 2 | Beaver Dam | | | 0 | Length | 0 | ----- | 0 |
M10-0 | 2 | Beaver Dam | | | 0 | Length | 0 | ----- | 0 |
M10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M11-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 196.79 | ----- | 0 | ----- | 0 |
M11-0 | 2 | Beaver Dam | | | 0 | Length | 1000 | ----- | 0 |
M11-0 | 2 | Beaver Dam | | | 0 | Length | 400 | ----- | 0 |
M11-0 | 2 | Bridge or Culvert | | | 76.54 | Length | 0 | ----- | 0 |
M11-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M11-0 | 2 | Encroachment | Road | One Side | 288.79 | ----- | 0 | ----- | 0 |
M11-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Beaver Dam | | | 0 | Length | 1300 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Erosion | | Left Bank | 88.01 | Height | 4 | ----- | 0 |
M12-A | 2 | Erosion | | Right Bank | 34.87 | Height | 3 | ----- | 0 |
M12-A | 2 | Mass Failure | | | 0 | Height | 15 | ----- | 0 |
M12-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
M12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 129.01 | ----- | 0 | ----- | 0 |
M12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 37.85 | ----- | 0 | ----- | 0 |
M12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 155.24 | ----- | 0 | ----- | 0 |
M12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 187.91 | ----- | 0 | ----- | 0 |
M12-B | 2 | Bridge or Culvert | | | 99.46 | Length | 0 | ----- | 0 |
M12-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-B | 2 | Erosion | | Left Bank | 93.8 | Height | 3 | ----- | 0 |
M12-B | 2 | Erosion | | Left Bank | 101.94 | Height | 3 | ----- | 0 |
M12-B | 2 | Erosion | | Left Bank | 132.13 | Height | 3 | ----- | 0 |
M12-B | 2 | Erosion | | Left Bank | 157.5 | Height | 4 | ----- | 0 |
M12-B | 2 | Erosion | | Right Bank | 43.51 | Height | 3 | ----- | 0 |
M12-B | 2 | Erosion | | Right Bank | 79.01 | Height | 3 | ----- | 0 |
M12-B | 2 | Erosion | | Right Bank | 84.45 | Height | 3 | ----- | 0 |
M12-B | 2 | Erosion | | Right Bank | 97.79 | Height | 3 | ----- | 0 |
M12-B | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
M12-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
M12-B | 2 | Straightening | Straightening | | 209.37 | ----- | 0 | ----- | 0 |
M12-B | 2 | Straightening | Straightening | | 731.9 | ----- | 0 | ----- | 0 |
M13-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 104.43 | ----- | 0 | ----- | 0 |
M13-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 233.05 | ----- | 0 | ----- | 0 |
M13-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 61.43 | ----- | 0 | ----- | 0 |
M13-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 91.2 | ----- | 0 | ----- | 0 |
M13-A | 2 | Bridge or Culvert | | | 99.96 | Length | 0 | ----- | 0 |
M13-A | 2 | Development | | One Side | 152.08 | ----- | 0 | ----- | 0 |
M13-A | 2 | Encroachment | Road | One Side | 323.06 | ----- | 0 | ----- | 0 |
M13-A | 2 | Erosion | | Left Bank | 76.59 | Height | 3 | ----- | 0 |
M13-A | 2 | Mass Failure | | | 0 | Height | 12 | ----- | 0 |
M13-A | 2 | Stormwater Input | | | 0 | ----- | 0 | ----- | 0 |
M13-B | 2 | Encroachment | Road | One Side | 69.33 | ----- | 0 | ----- | 0 |
M13-B | 2 | Encroachment | Road | One Side | 119.43 | ----- | 0 | ----- | 0 |
M13-B | 2 | Grade Control | Ledge | Downstream | 0 | Height | 6 | HtAbvWater | 3 |
M13-B | 2 | Stormwater Input | | | 0 | ----- | 0 | ----- | 0 |
M13-C | 2 | Bridge or Culvert | | | 81.55 | Length | 0 | ----- | 0 |
M13-C | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M13-C | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M13-C | 2 | Development | | One Side | 238.53 | ----- | 0 | ----- | 0 |
M13-C | 2 | Encroachment | Berm | One Side | 60.91 | ----- | 0 | ----- | 0 |
M13-C | 2 | Erosion | | Left Bank | 88.13 | Height | 3 | ----- | 0 |
M13-C | 2 | Erosion | | Right Bank | 119.61 | Height | 3 | ----- | 0 |
M13-C | 2 | Mass Failure | | | 0 | Height | 7 | ----- | 0 |
M13-C | 2 | Mass Failure | | | 0 | Height | 0 | ----- | 0 |
M14-A | 2 | Development | | One Side | 107.89 | ----- | 0 | ----- | 0 |
M14-A | 2 | Development | | One Side | 138.52 | ----- | 0 | ----- | 0 |
M14-A | 2 | Encroachment | Road | One Side | 250.09 | ----- | 0 | ----- | 0 |
M14-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M14-B | 2 | Grade Control | Waterfall | Downstream | 0 | Height | 4 | HtAbvWater | 4 |
M14-B | 2 | Grade Control | Waterfall | Downstream | 0 | Height | 4 | HtAbvWater | 4 |
M14-B | 2 | Grade Control | Waterfall | Downstream | 0 | Height | 4 | HtAbvWater | 4 |
M14-B | 2 | Stormwater Input | | | 0 | ----- | 0 | ----- | 0 |
M14-B | 2 | Stormwater Input | | | 0 | ----- | 0 | ----- | 0 |
M15-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M15-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M15-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M15-0 | 2 | Mass Failure | | | 0 | Height | 30 | ----- | 0 |
M15-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |