Skip Navigation LinksHome > Projects List > Phase 1 > Exclude Reaches

Mill Brook

Exclude Reaches from Assessment

A reach can be excluded from the assessment if it is a significant impoundment, or if it is not being assessed at this time.

Click on the Edit button to exclude or include a reach in the assessment.

ReachStream Name * ImpoundedNot Assessed
M01main stem N N
M02main stem N N
M03main stem N N
M04main stem N N
M05main stem N N
M06main stem N N
M07main stem N N
M08main stem N N
M09main stem N N
M10main stem N N
M11main stem N N
M12main stem N N
M13main stem N N
M14main stem N N
M15main stem N N