Skip Navigation LinksHome > Projects List > Phase 1 > Exclude Reaches

Winooski Lower - LC up to Alder

Exclude Reaches from Assessment

A reach can be excluded from the assessment if it is a significant impoundment, or if it is not being assessed at this time.

Click on the Edit button to exclude or include a reach in the assessment.

ReachStream Name * ImpoundedNot Assessed
R01Winooski N N
R02Winooski N N
R03Winooski N N
R04Winooski N N
R05Winooski N N
R06Winooski N N
R07Winooski N N