Skip Navigation LinksHome > Projects List > Phase 1 > Exclude Reaches

Hoosic

Exclude Reaches from Assessment

A reach can be excluded from the assessment if it is a significant impoundment, or if it is not being assessed at this time.

Click on the Edit button to exclude or include a reach in the assessment.

ReachStream Name * ImpoundedNot Assessed
M01Hoosic River N N
M02Hoosic River N N
M03Hoosic River N N
M04Hoosic River N N
M05Hoosic River N N
M06Hoosic River N N