Act 250 Agenda for a 3-week period. (This week, the prior week, and the week after.)

The agenda is an aggregate list of Act 250 projects that have been noticed or for which a decision or Jurisdictional Opinion (JO) has been issued.

This page is updated daily, so check back often.
34 Projects. Click [View] for details.
 Project NumberApplication TypeApplicant(s)Landowner(s)Project AddresDescriptionStatusTownHearing DateDecision IssuedAgenda DateComment/Petition due by
2S0796-6 Ryan Gumbart Town of Weathersfield; Town of Weathersfield; 0 US Route 5 an extension and renewal to continue operations of the "Bow Sand Pit" located in the town of Weathersfield. Withdrawn Weathersfield Yes 10-12-2026
5W0816-5 Ken Nolan Vermont Public Power Supply Authority; Vermont Public Power Supply authority; 5195 Waterbury-Stowe Rd VPPSA application for a project generally described as the expansion of the on-site parking area with 23 new spaces, for a total of 43 spaces, including 2 ADA accessible spaces and 1 EV charging facility with two stations. The project also involves the installation of related EV underground electric infrastructure, grading, drainage improvements, and restoration of any landscaping disturbed during construction. The existing office building, office use, and existing access drive off Vermont 100 will remain unchanged, although some existing interior plumbing fixtures will be replaced with water conserving fixtures. Pending (Comment Period) Waterbury No 10-12-2026 10-28-2026
5W0457-13 Adm. Amend Brian Donahue Green Mountain Valley School; Green Mountain Valley School; 271 Moulton Road This permit specifically authorizes the Permittee to replace the existing leach field servicing the Clark House dormitory and relocate the primary and replacement areas for the Sports Center. The Project is located at 271 Moulton Road in Fayston, Vermont. Permit Fayston Yes 10-12-2026
4C0329-17V-1 Adm. Amend Glenn Cummings 22 Corporate Drive, LLC; Glenn Cummings 22 Corporate Drive, LLC; 22 Corporate Drive Extension of the construction completion date for Land Use Permit Amendment 4C0329-17V, authorizing construction of a 16,100 SF warehouse and parking area. The Project is located at 22 Corporate Drive in Essex, Vermont. Permit Essex, Town of Yes 10-12-2026
4C0329-22A Adm. Amend Andrew Hood; Andrew Hood; 70 Boston Court Extension of the construction completion date for Land Use Permit Amendment 4C0329-22, authorizing construction of four (4) warehouse buildings, an access road, a pedestrian pathway and associated site improvements. The Project is located at 1 Allen Martin Drive in Essex, Vermont. Permit Essex, Town of Yes 10-12-2026
4C1341-1 Adm. Amend Saint Michael's College; Saint Michael's College; 513 Hegeman Ave. Subdivision of an existing, developed, parcel (Parcel B into B-1 and B-2) to create one new lot to permit the sale of an existing building (513 Hegeman Avenue). No changes to the site or existing buildings or their uses are proposed. The involved parcels are owned by St. Michael’s College. The Project is further described in the JO request and exhibits (Project Number JO 4-507 on the Act 250 Database online). Permit Colchester Yes 10-19-2026
6G0560-3B Adm. Amend Town of Grand Isle; Town of Grand Isle; 9 Hyde Road This permit specifically authorizes: (1) construction of a ±512 square foot open-air pavilion; (2) installation of a generator; and (3) revision of Condition 33 of Land Use Permit #6G0560-3. The Project is located at 9 Hyde Road in Grand Isle, Vermont. Permit Grand Isle Yes 10-12-2026
8B0059-2A Adm. Amend 1934Plymouth, INC.; 1934 Plymouth, Inc.; 5403 VT RT 7A This permit specifically authorizes the modification of condition 12 to eliminate the restriction of outdoor live music events to [only] Thursdays and Saturdays. Specifically, the Permittee is authorized for a maximum total of 35 outdoor live music event days during the time period June through October, with flexibility for the scheduled event days. No other modifications to the project or existing permit conditions are requested or authorized herein. The Project is located at 5403 VT Route 7A in Arlington, Vermont (SPAN: 015-005-10560). Permit Arlington Yes 10-19-2026
JO 1-529(Reconsidered) JO Pasquale (Pat) & Pau Patorti; 69 1/2 Allen Street, 162 Jackson Ave., 48 South Main Street The following is a reconsideration of Jurisdictional Opinion JO 1-529, in which I determined that the 69 1/2 Allen St., 162 Jackson Ave., and 48 South Main St. properties triggered the need for an Act 250 permit in 2008. JO issued Rutland City Yes 10-19-2026
JO 1-531 JO Vermont Department of Buildings and General Services; US Route 7, VT Route 103, VT Route 7B SPAN 150-047-11630 The following is a jurisdictional opinion with respect to your query as to whether the construction of a new Vermont State Police Field Station including a new Public Safety Building, garage, and associated access drive, parking, utilities, and stormwater management would trigger the need for an Act 250 permit. JO issued Clarendon Yes 10-19-2026
JO 2-383 JO Soundview Vermont Holdings LLC; 67 Kathan Meadow Dr I have an applicant seeking approval for a change of use on parcels that I believe have Act 250 permits in place. I am seeking guidance on if these permits are relevant and / or the applicant needs to seek approval from you? Parcels: 000337, 000338, 000341. 67 Kathan Meadow Rd. Dummerston. Current Owner: Soundview Vermont Holdings LLC Applicant: Ed Higley, Maple Farms LLC Change of Use: Paper processing to pallet manufacturing Two permits that I saw on the database: 2W0436-3, 2W0436-4 Note: the applicant has started the business without any permits. I requested that he submit an application to the Town DRB for approval (hearing on 9/15/26) On a site visit I noted that he was storing material in the Flood Hazard Area and warned him that State approval was required for this activity. I contacted Jessica Barsaleau about this. It remains to be seen if he will comply. JO issued Dummerston Yes 10-12-2026
JO 3-436 JO David & Lucy Bryant; 20 Edwins Pond In 2007, David & Lucy Bryant obtained a municipal building permit to build a residential garage on lot 1 of 3W0069 and they subsequently constructed it without obtaining a jurisdictional opinion from Act 250. JO issued Rochester Yes 10-12-2026
JO 3-438 JO 217 Billings Farm Rd. Construct a 1300 square foot café addition on the existing manufacturing facility and build two detached buildings (an 8500 square foot office building and a 9600 square fgoot manufacturing building) as well as reconfigure the parking lot. JO issued Hartford Yes 10-19-2026
JO 4-552 JO 54 and 0 West Milton Road Request for final JO regarding earth-material extraction (gravel, sand, related processing), expansion of an existing extraction operation, facilitated by a municipal lot line and minor subdivision adjustment between two parcels. Withdrawn Milton Yes 10-12-2026
JO 4-556 JO Ashley Walenty City of Burlington; City ROW - North Champlain St., Park/Summer St., Intervale Ave. Record created in error. Request will be processed as a PRS. Inactivated Burlington Yes 10-12-2026
JO 7-488 JO 352 Papermill Rd. Request for jurisdictional opinion as to whether construction of improvements necessary to convert multiple structures at a former paper mill into housing requires an Act 250 permit. JO issued Ryegate Yes 10-19-2026
JO 7-491 JO New Hope Bible Church; 1145 Route 14 North This project proposes a dimensional modification to a previously approved (under LUP 7R1088) pavilion structure. The proposed pavilion would be two stories and approximately 25' in height in order to achieve a 6/12 pitch to help with snow load. The proposed pavilion location is interior to the site and not visible from the public roadway. The proposed pavilion will be 7.5' narrower on both sides, resulting in an overall reduction in width of 15' and will be 20' longer on both ends, resulting in an overall increase in length of 40'. This results in an increase in 900 square feet and accounts for ~0.03% of the overall property. There is no change to the proposed location of the pavilion, located on disturbed land that has been previously graded and is partially gravel surfaced in its existing state. Exterior colors/materials will be earth-toned to match the existing multi-purpose building. Materials will likely be LP smartside or similar siding (Clapboard style). The roof will be shingled. Exterior lighting will be building mounted, down shielded LEDs. Specific fixtures have not yet been chosen. No change in use of the pavilion is proposed. JO issued Irasburg Yes 10-19-2026
JO 7-493 JO Shawn and Loralee Tester; 597 Sugar Maple Road Commercial paintball venue JO issued Lyndon Yes 10-12-2026
JO 7-494 JO Hudson Rd. Request for jurisdictional opinion as to whether creation of 5 lots requires an Act 250 permit. JO issued Canaan Yes 10-19-2026
JO 7-495 JO 467 Broad St. Pave a 14 feet wide ROW exit lane at the rear of the 467 Broad Street property in Lyndon to maximize traffic safety when serving the 469 Broad Street property JO issued Lyndon Yes 10-19-2026
5W0952-6 Minor Town of Barre; Robert Milne; Sugarwoods Rd Project generally described as the construction of updated stormwater treatment infrastructure at Sugarwoods residential subdivision in Barre Town to bring the subdivision into compliance with the State mandated 3-Acre Rule. The project involves the construction of a bioretention system to treat stormwater from 2.098 acres of impervious surface. The project includes the construction of a 4’ wide berm with a 5’ wide high-flow spillway with an 8” PVC underdrain carrier pipe to convey discharge to two new catchbasins. A 24” sump will be installed in each basin to trap sediment prior to discharging to a stone outfall with a precast concrete headwall. The system also includes the installation of a new drainage manhole with a 24” frame and grate drain cover and 24” sump, and three new catchbasins with 24” square frame and grate and 24” sumps for conveyance to the system. The bioretention system will be located in a grassed area south of Sugarwoods Road at its northerly intersection with Windy Wood Road, Barre Town, Vermont. Pending (Comment Period) Barre Town No 10-12-2026 10-31-2026
6G0203-3 Minor Kathy Beyer Round Barn Housing Limited Partnership; Round Barn Housing Limited Partnership; 29 Faywood Road Construction of a new 16-unit senior housing building at the existing Round Barn Apartments development, followed by demolition of the existing 16-unit senior housing “Round Barn” building. The new 16-unit building and existing “Annex” building will be served by an existing shared mound wastewater disposal system and a new municipal water service connection. The project also involves general stormwater, utility, and parking improvements. The Project is located at 29 Faywood Road in Grand Isle, Vermont. Permit Grand Isle Yes 10-12-2026 09-23-2026
9A0158-19 Minor Sean Flynn; State of Vermont Agency of Transportation; Airport Road This permit specifically authorizes construction of a ±9,800 square foot, 2-unit airplane hangar on a leased site at Middlebury State Airport. The hangar will be the southernmost hangar at the airport, and will be used solely for aircraft storage, with no connections to water or sewer. Commercial use and operations of the hangar, along with servicing, fueling, and fuel storage, are prohibited. The Project is located at 467 Airport Road in Middlebury, Vermont. Permit Middlebury Yes 10-12-2026 09-16-2026
9A0374 Minor Smith & McClain, Inc.; Hewitt Road Construction of a contractor yard for two tenant businesses in a 2,600 sf building on a 3.5 acre subdivided lot with 0.95 acres of impervious surface Abandoned Bristol Yes 10-12-2026 10-28-2019
4C1364 Minor Steve Hardy L.D. Oliver Seed Co. Inc; Calvin Leung CV Properties Incorporated; Steve Hardy L.D. Oliver Seed Co. Inc; 26 & 40 Sunset Ave This permit specifically authorizes the after-the-fact construction of commercial buildings to serve an existing agricultural seed/fertilizer production and distribution business. More specifically, the after-the-fact construction of a warehouse (constructed 1995+/-), a storage building (constructed 2006+/-), a greenhouse (constructed 2016+/-), outdoor storage canopy (constructed 2021+/-), and partial construction of a 40’ x 70’ storage building (construction started in 2025). The permit also authorizes completing construction of the 40’ x 70’ storage building and demolition of a pre-1970 storage building. Both the after-the-fact and proposed work detailed above make up “the Project.” The Project is located at 40 and 26 Sunset Ave in Milton, Vermont. Pending (Comment Period) Milton No 10-12-2026 10-27-2026
5L1338(Altered)-44 Minor VR US Holdings II; VR US Holdings, II, LLC; 5761 Mt Road This permit specifically authorizes the clearing of .36 acres through the existing canopy for two new trails on Spruce Peak. One trail will serve beginner skiers, and the second trail will serve as emergency access to a small glade between the East Run and Upper Meadow trails. Each trail will be 22’ wide (width of a groomer) and 350’ long. Approximately 64 trees total with an average diameter of 5.6 inches will be removed and chipped on-site. The existing canopy between the two trails, approximately 250’ to 300’ wide, will be retained. Permit Stowe Yes 10-12-2026 10-06-2026
1R0322-15A Minor Steve Malone Ottaquechee Realty Advisors, LLC; Killington/Pico Ski Resort Partners, LLC; Steve Malone Ottaquechee Realty Advisors, LLC; 970 Bear Mountain Road The rerouting of a 900-linear-foot section of the previously approved community water supply distribution line onto private land instead of through Calvin Coolidge State Forest lands (superseding the previously approved potable water line design); miscellaneous non-material field revisions to Phase 1 project elements (detailed in Exhibit 024); and the extension of the Phase 1 construction completion deadline from October 15, 2026, to October 15, 2029. No other changes to the design, location, and/or phasing of the previously authorized project under LUP 1R0322-15, including a three-parcel subdivision of the 25-acre project tract, are requested. Pending (Comment Period) Killington No 10-19-2026 11-04-2026
1R1035 Minor Outright Vermont; Outright Vermont; 2050 Sunset Lake Road The project is generally described as the improvements to the preexisting development, Camp Sunrise. More specifically, the project proposes new construction of a 6,477-sf “Hub Building” (serving as an activity space, kitchen, bathhouse, and emergency shelter), replacement of existing lean-tos/tent platforms with three new cabins at each existing campsite location (campsites #1 - #4), replacement of an existing cabin with a new cabin at the existing “Counselor Cabin” campsite location, renovation and construction of an addition to the existing water system shed to support the addition of two bathrooms and two showers, construction of a screened pavilion addition to the existing dining hall, construction of stormwater infrastructure, and reconfiguration and extension of access/walking paths. Permit Benson Yes 10-12-2026 08-10-2026
200060-3,7R0887-2 Minor Stewarts Shops Corp.; James Bartley Barbara A. Bartley Trust; Stewarts Shops Corp.; 4486 US-5 To construct a new standalone convenience store with separate gasoline and diesel fueling canopies at 4486 Route 5 in the Town of Derby. Stewart’s is under contract to purchase approximately 49,658 square feet of land located at 4518 Route 5 (SPAN #177-056-10120), which is adjacent to the existing convenience store. The existing convenience store and fueling canopies, as well as the structure currently located at 4518 Route 5, will be demolished. A lot line adjustment has been approved by the Town of Derby, allowing the portion of the parcel at 4518 Route 5 to be consolidated with the existing Stewart’s parcel at 4486 Route 5 (SPAN #117-056-11259), creating a single unified property for the proposed development. Permit Derby Yes 10-12-2026 08-13-2026
4C0331-45 Minor Nic Longo Patrick Leahy Burlington International Airport; City of Burlington, Burlington International Airport; 1200 Airport Drive The project, ‘BTV Cargo Apron Expansion’ includes the proposed expansion of a cargo apron and relocation of the vehicle service road (VSR) located just east of Runway 1-19 at BTV, an active public use commercial airport located at 1200 Airport Drive in South Burlington. The project would result in 4.275 acres of total impervious area, comprised of the following: 2.088 acres of existing impervious, 0.449 acres of redeveloped impervious, and 1.738 acres of proposed impervious. Permit South Burlington Yes 10-12-2026 06-16-2026
4C0610-5A Minor Robert and Joy Reap; Robert and Joy Reap; 365 Bear Creek Rd This permit specifically authorizes tree clearing and the construction of a shed and parking area within a newly created building envelope. The shed will not be utilized for commercial activities or connected to any utilities. Both the shed and new parking area will be accessed off the existing driveway, (the “Project”). Pending (Comment Period) Richmond No 10-12-2026 11-03-2026
2W0358-10 Minor Banger Park USA, LLC; Waker-Casey, LLC; 431 Glebe Mtn Rd the construction and operation of a Freeski and Snowboard Airbag Training Center. The training center is proposed at the former Timber Ridge Ski Area. The existing gravel parking area will be resurfaced but will not be expanded. Four jumps are proposed within existing ski trail cuts, each with a run-in slope, jump and air bag landing. Two magic carpets are proposed from the mountain base to the top of the jumps and underground electric will be installed to the jumps. The jumps will require misting, with water supply from existing non-potable wells on the property and water storage is proposed in an above ground tank Pending (Comment Period) Windham No 10-12-2026 11-05-2026
300022-8 Minor Scott Kirkwood Pomerleau Properties, Inc.; Ernest Pomerleau Antonio B. Pomerleau, LLC; 45 Hinesburg Road This permit specifically authorizes the installation of a new, double-sided monument sign adjacent to the Commerce Square Plaza access on Hinesburg Road. The signage area is approximately 36 square feet with downcast illumination from an LED fixture (the “Project”). The Project is located at 45 Hinesburg Road in South Burlington, Vermont. Pending (Comment Period) South Burlington No 10-12-2026 10-27-2026
4C0203-1 Minor John Lacy; Mark Edmunds; Michelle Edmunds; 192 Governors Lane This permit specifically authorizes after-the-fact approval for the demolition of an existing single-family home on Lot 2 of the Barstow Acres development, and the subsequent construction of new 4-bedroom single-family home with a 1-bedroom accessory dwelling unit served by an existing well and new septic mound system. Pending (Comment Period) Shelburne No 10-12-2026 11-03-2026