39 Projects. Click [View] for details.
 Project NumberApplication TypeApplicant(s)Landowner(s)Project AddresDescriptionStatusTownHearing DateDecision IssuedAgenda DateComment/Petition due by
5W1414-B Adm. Amend Jason Zipprich; Jason Zipprich; Lot 47, East Countryside Road This permit specifically authorizes shifting the well and house site as approved in the wastewater permit WW-5-2038-4. All other aspects of the project will remain the same as originally permitted. The Project is located at Lot 47, East Countryside Road in Waterbury, Vermont. Permit Waterbury Yes 05-19-2025
5W0542-7A Adm. Amend Chris Knortz; Caroline Mchugh; Chris Knortz; Cider Mountain Road This permit amendment specifically authorizes relocation of the curb cut for the previously approved driveway serving Lot 3, as depicted in the approved plan (the “Project”). The Project is located off Cider Mountain Road in Warren, Vermont. Permit Warren Yes 05-26-2025
JO 1-501 JO Sherburne Fire District #1; 107 Dean Hill Road Replacement of the rotating biological contactors at the Wastewater Treatment Facility (WWTF) and two effluent pumps within existing structures. The equipment is being replaced in-kind with no increase in capacity and no expansion of the WWTF. The Project is further described in the JO request and exhibits (Project Number JO 1-501 on the Act 250 Database online). JO issued Killington Yes 06-02-2025
JO 2-364 JO Tuckerville Pkwy JO request for a project that proposes to excavate the a force main, install rigid foam insulation, and backfill the area, returning it to its original appearance and grade. JO issued Ludlow Yes 06-02-2025
JO 3-388 JO Town of Chelsea; 234 Route 110 Replacement of the influent pump station at the Wastewater Treatment Facility at the site of the existing pump station. The pump station capacity is not increasing and there is not expansion of the WWTF. JO issued Chelsea Yes 05-26-2025
JO 4-456 JO Barnes Ave, Hegeman Ave, Ethan Allen Dr, Dalton Rd, Diane Dr Replace and upgrade existing water mains along multiple streets in Fort Ethan Allen (Barnes Ave., Hegeman Ave., Ethan Allen Dr. Dalton Dr., and Diane Dr.). A new fire hydrant is proposed to be installed at the Troy Ave and Barnes Ave intersection. Water service lines of individual buildings will also be replaced up to the curb stop at the Town of Essex’s right-of-way, unless lead is found wherein it will be replaced to the building's meter. The project will be conducted in three phases, as depicted in Figure No. 3, titled “Phase Plan” of exhibit “22015-SET”. The project will result in approximately 6.32 acres of total disturbance through all three phases; the phases will be staggered and will not result in any additional permanent impervious acreage. Phase 1 will result in 2.31 acres of disturbance, Phase 2 will result in 1.36 acres of disturbance, and Phase 3 will result in 2.65 acres of disturbance. The project will require coverage under the Construction General Permit 3-9020 issued by the Agency of Natural Resources (ANR) Watershed Management Division, and will also require additional permitting under the ANR Drinking Water and Groundwater Protection Division. The project tract contains contaminated soils, and requires a soils management plan approved by ANR Sites Management Section. The Project is further described in the JO request and exhibits. JO issued Essex, Town of Yes 05-19-2025
JO 4-460 JO Shelburne Limestone Corp.; 688 Quarry Road, 263 Quarry Road, 220 Ledge Hill Request for continuation of existing limestone extraction from an open pit quarry for agricultural and structural aggregate uses. The continued extraction involves expansion beyond the current pit walls. The proposed expansion area is 9.89 acres. The pit has been in operation since the 1960s. Area mapping shows significant expansion from 1992 onward. The total acreage of the parcels on which the project will occur is 138.1 acres. The landowner is Shelburne Limestone Corp., P.O. Box 359, Essex Jct., VT 05453: ddemers@me.com The Project is further described in the JO request and exhibits. JO issued Shelburne Yes 05-19-2025
JO 7-438 JO Weidmann Electrical Technologies; One Gordon Mills Way Request for jurisdictional opinion as to whether installation of a water line and fire hydrant to be connected to an existing water service line at the southeast corner of the Fab North building requires an Act 250 permit. JO issued Saint Johnsbury Yes 05-26-2025
JO 7-440 JO 349 McCoy Road Removal and sale of topsoil to a company that provides construction materials for the purpose of making the land available for future business ventures. Topsoil removal would occur in upland (i.e., non-wetland) portions of an existing 25-acre field. JO issued Irasburg Yes 06-02-2025
4C0436-32C Major BVR, LLC; BVR, LLC; 4302 Bolton Valley Access Road The project requests approval to extend the use of the mountain bike trails. The extension requests approval to operate full weeks in early and late season (Memorial Day through October), and also to extend the daily operating hours. Pending (Hearing) Bolton 06-04-2025 No 05-26-2025
1R0501-24 MajorMinor Moon Dance, LLC.; Moon Dance, LLC.; 0 Falls Brook Road This permit specifically authorizes the Permittee to subdivide a 256.9-acre parcel of land and complete the site work and construction of common, ancillary infrastructure and utilities serving phase I (Lots 15-24) of a residential subdivision. Phase I of the project includes: 10 residential lots (Lots 15-24, each designed for a 4-bedroom single family residence with 7- person maximum occupancy); a 210-acre “retained lot” (to remain undeveloped); interior roadways to access Lots 15-24, including a portion of Main Street, Front & Center Drive, and 17/18 Drive; 10 mound wastewater systems within the community wastewater disposal field and a forced main sewer line to serve Lots 15-24; stormwater infrastructure and controls to treat stormwater from phase I; and implementation of the phase I cutting/clearing and riparian management plan (the “Project”). The Project is proposed to be undertaken in two phases; only construction of improvements identified as part of phase I is requested and authorized herein. Construction of improvements of phase II of the residential subdivision, including common infrastructure, utilities, dwellings or accessory structures, and site work on or serving Lots 1-14, 25, 26, and the ‘Barn Lot”, is not authorized until a land use permit amendment is issued authorizing that construction. The project (“Killington Cherry Knoll”) is located off the terminus of Falls Brook Road in Killington, Vermont. Permit Killington 03-28-2024 Yes 05-19-2025 04-07-2023
1R0563-1 Minor Rutland Hospital, Inc. dba Rutland Regional Medical Center (RRMC); Rutland Hospital, Inc. dba Rutland Regional Medical Center; 435 West Street The application seeks authorization for the following site improvements: installation of an egress door on the northeasterly side of the larger building; expansion of existing parking areas; formalization and paving of existing gravel parking; repairing and repaving existing parking lots; site grading/modifications to accommodate ADA accessible route requirements and improve accessibility; installation of a new walkway to accommodate building egress safety requirements; replacement of existing light poles and fixtures; installation of additional site lighting; installation of two new underground stormwater treatment systems; and placement of new mechanical equipment on the north side of the building. Pending (Comment Period) Rutland City No 05-26-2025 06-12-2025
1R0566-2 Minor VTrans C/O-Julie Ann Held Agency of Transportation; Richard Sprague Hop Energy, LLC; VTrans C/O-Julie Ann Held Vermont Agency of Transportation; VT Route 31, Bridge No. 4 over Poultney River This permit specifically authorizes the following work on the Project Tract for the purpose of supporting the rehabilitation of Bridge No. 4 along VT Route 31 over the Poultney River: construction and removal of a temporary bridge detour, use (including placement of fill) and restoration of existing utility access road, and replacing stone fill on bridge abutment. The project is located at 324 Bentley Avenue in Poultney Vermont, adjacent to VT Route 31, Bridge No. 4 over the Poultney River. Permit Poultney Yes 05-26-2025 05-20-2025
1R0923-1A Minor James Theodore; James Theodore; James Theodore; James Theodore; 1894 US Route 4 Applicant is seeking approval for the partial re-design of the previously approved project; specifically, the construction of a maximum of 27 unplumbed, climate-controlled public self-storage units in lieu of the two one-bedroom apartments within the 2,050 square feet of the first floor (northside) of the existing 3,700-square foot building, and the corresponding relocation/installation of two doors and overhangs. The overall project will now consist of a total of two two-bedroom apartments (on the second floor of the existing building); 1,394 square feet of owner (only) storage in the first floor (south side) of the existing building; and a maximum of 87 public self-storage units onsite (60 total units amongst the three previously approved buildings and up to 27 units in the existing building). No other changes to the project approved under 1R0923-1 have been requested. Permit Killington Yes 05-26-2025 05-20-2025
1R0925-5 Minor Julie Ann Held Vermont Agency of Transportation; State of Vermont, Agency of Transportation; 7551 US Route 7, Pittsford, VT As part of a master plan, LUP 1R0925-1 (issued April 25, 2008) authorized the reconstruction of segments 1 and 4 of a 3.04-mile segment of US Route 7 between the towns of Pittsford and Brandon; the reconstruction of Segment 4 was never undertaken, and the Segment 4 design plans have since been modified. Applicant seeks reauthorization for the redesign and reconstruction of 2.71 kilometers (1.68 miles) of US Route 7 spanning the Towns of Pittsford and Brandon, i.e., Segment 4 of VTrans Federal Aid Project Number Pittsford-Brandon NH 019-3(49). Reconstruction includes the removal and disposal of the existing concrete road; the widening and full depth reconstruction of U.S. Route 7, from ~28-foot-wide roadway to ~40-foot-wide roadway; two truck climbing lanes; replacement of Bridge 110 (box culvert); extension of Bridges 111 and 112 (box culverts); grading, drainage and stormwater infrastructure installation; relocation of aerial utilities; installation of signage and guardrails; and paving and necessary approach work. The Project will be completed in a total of four major phases with multiple sequences per phase and will involve a total earth disturbance of 30.64 acres, including 0.84-acres of tree clearing and 5.07-acres of construction phase woody vegetation clearing. Applicant also seeks authorization for the payment of a fee for offsite mitigation to compensate for the acreage of primary agricultural soils whose agricultural potential has been reduced or eliminated as a result of the project. Pending (Comment Period) Pittsford No 05-19-2025 06-02-2025
2S0785-8 Minor Nikita Lenahan Bambino University LLC; Steve Greene; 2588 Rt 103 the change of use of an existing restaurant building to an early childcare education center with a maximum capacity of 60 students and 10 employees. More specifically, this permit authorizes the installation of a fence, new signage, and interior renovations Pending (Comment Period) Cavendish No 06-02-2025 06-24-2025
2S1085-2 Minor Ruby Iantosca c/o The Arborview Companies; Raymond Rd. the creation of Lot 9 and the construction of a single-family home on Lot 9 (the “Project”). No other lots or construction is approved. Pending (Comment Period) Ludlow No 06-02-2025 06-25-2025
2W0250-2 Minor Vermont State Housing Authority; The Housing Foundation, Inc.; Shady Pines Park off Back Westminster Rd. drinking water storage and distribution system upgrades to the existing on-site public water system, which serves the existing 28 mobile home lots located in the Shady Pines Park. More specifically, the permit authorizes the following work: 1) replacement of the existing 6,000 gallon steel pressure storage tank with two 4,000 gallon buried fiberglass storage tanks (atmospheric) with a drain to daylight, 2) construction of a new dual-alternating booster pump system in the existing water building to maintain pressure in the mobile home park distribution system, 3) replacement of +/- 850 ft of water mains, 4) replacement of +/- 525 ft of existing water services in the southern water distribution system, and 5) renovation work to the foundation, walls and roof of the existing water building (the “Project”). The Project does not propose an increase in water supply demand. Permit Westminster Yes 05-19-2025 05-08-2025
2W0265-2 Minor Tyler Wren Wrenegade Rentals, LLC; Tyler Wren Wrenegade Rentals, LLC; 4769 Pikes Falls Road This project is generally described as the construction of three (3) seasonal cabin campsites, underground power, gravel driveway/parking areas, and an access path to the adjoining cemetery. Pending (Comment Period) Jamaica No 05-19-2025 06-04-2025
3R0199-1B Minor Justin Beaulieu; Barbara Beaulieu; Paul Beaulieu; 396 Industrial Park The addition of a 30’ x 12’ garage stall to store a vehicle and a 36’ x 20’ garage stall to store a loader to the existing building that formerly housed delivery trucks used for an automotive replacement battery business (Beaulieu’s, Inc. d/b/a Interstate Battery System of New-Mont). It now is used to house five flatbeds and a wrecker and miscellaneous equipment for JTB Towing & Recovery, LLC Permit Newbury Yes 05-26-2025 05-15-2025
4C0219-61,4C1057-7 Minor City of South Burlington; Burlington UMall Owner LLC C/O Taconic Capital Advisors LP; Larkin Family Partnership; 1, 3, 5, and 155 Dorset Street This permit specifically authorizes the construction of shared use paths, infrastructure, and landscaping in conjunction with a pedestrian bicycle bridge across I-89 at Exit 14 in South Burlington, Vermont. The construction involved in this project is located at 1, 3, 5, and 155 Dorset Street in South Burlington, Vermont. Permit South Burlington Yes 05-19-2025 05-02-2025
4C0646-10 Minor Shelburne Museum, Inc; Shelburne Museum, Inc; 6000 Shelburne Road This project proposes construction of the Perry Center, an 11,200± square foot building for Native American Art. The project includes regrading of the site, relocation of existing pathways, new underground utilities, new stormwater management facilities, and new landscaping. The project is located at 6000 Shelburne Road in Shelburne, Vermont. Permit Shelburne Yes 05-26-2025 03-18-2025
4C0983-16I Minor Elevation Construction, LLC; Keith Neil; 94 Long Drive This permit specifically authorizes the construction of a three (3) bedroom house on Lot 10 (94 Long Drive). The structure will be two-stories, wood framed, wood siding, and the roof will have dark asphalt shingles. This permit is issued in accordance with the requirements of Condition #12 in 4C0983-16A; this application identifies waste disposal for Criterion 1(B), aesthetics for Criterion 8, and provides an application fee based on the estimated construction cost of Lot 10 of the Long Drive Subdivision (the “Project”). The Project is located at 94 Long Drive in South Burlington, Vermont. Pending (Comment Period) South Burlington No 05-26-2025 06-12-2025
4C1065-9E Minor City of Winooski; City of Winooski; 17 Abenaki Way This after-the-fact permit specifically authorizes the previously approved 302-space parking garage to be constructed as a 275-space parking garage. The project is located at 17 Abenaki Way in Winooski, Vermont. Pending (Comment Period) Winooski No 05-26-2025 06-12-2025
4C1363 Minor Tom Sheppard Rivers Edge Building Development, LLC; Tom Sheppard Rivers Edge Building Development, LLC; 13 Sweeney Farm Road This project proposes construction of a 1,200 linear foot extension to Sweeney Farm Road and the creation of a subdivision called Hillside Meadows, consisting of 14 four-bedroom, single-family homes with conserved land, connection to municipal water and private septic systems. The project is located at 13 Sweeney Farm Road in Milton, Vermont. Pending (Comment Period) Milton No 06-02-2025 06-20-2025
5L0923-4 Minor Cynthia Whitham Ship Sevin II LLC; Ship Sevin II LLC; 59 Katy Win West The project is generally described as the construction of stormwater treatment practices at the Katy Win Mobile Home Park, including two non-infiltrating dry swales, two non-infiltrating subsurface sand filters, and associated stormwater conveyance facilities. The project is located off Katy Win Road in Johnson, Vermont. Pending (Comment Period) Johnson No 05-26-2025 06-11-2025
5L1037-4 Minor Decker Realty Holding, LLC; Soni, LLC; Decker Realty Holding, LLC; 4837 Route 15 This permit specifically authorizes the conveyance of 0.2 acres from Decker Realty Holding’s 2.3 acres Lot 1C to Applicant Soni, LLC, the new owner of the adjacent, pre-existing Cupboard Deli which will expand the deli’s parking area. In addition, Applicant Decker seeks approval for an as-built roofed structure (no septic) on Lot 1C that serves as seasonal storage for the previously permitted canoe rental business. Finally, the subdivision of the property requires a permit from VTrans to comply with the standards for a commercial drive. (Adjoining landowner Aubuchon Realty Company Inc. will utilize the drive as a secondary access).The improvements consist of the installation of curbing, grass and delineator posts. The project is located at 4837 VT Route 15 in Cambridge, Vermont. Permit Cambridge Yes 05-19-2025 05-13-2025
5W0441-2D Minor FHS Holdings, LLC; FHS Holdings, LLC; 222 Granger Rd The project is the proposed redevelopment of two existing lots located in Berlin. The project involves the renovation and expansion of the existing buildings on the property as well as the construction of several new storage buildings. The property is proposed to be used as a building material supply sales facility. The project also includes redeveloped access, circulation, and parking for deliveries, employees, and customers. The 222 Granger Road building is proposed to be expanded and become the main retail building for the development, with hardware sales, display areas, employee areas, and point of sale. The 21 Industrial Lane building is proposed to become a cold storage building for insulation and drywall. A new cold storage building is proposed for millwork, labeled as “Millwork Building” on the plans. Three new semi-enclosed storage buildings are also proposed for general building material storage, labeled as either “Storage Shed” or “Drive-Thru Storage” on the plans. Pending (Comment Period) Berlin No 05-26-2025 06-09-2025
5W0857-4 Minor Town of Barre; Wildersburg Home Owners Association, Inc.; Wildersburg Home Owners Association, Inc.; Wildersburg Common Road The project tract is a site included on the Vermont Department of Environmental Conservation’s list of Three-Acre Properties that require a Stormwater General Permit (3-9050). This permit specifically authorizes the construction of site wide stormwater upgrades involving the construction of six non-infiltrating subsurface chamber systems for stormwater treatment. Each chamber will have an underdrain which will discharge treated stormwater to the Jail Branch and its tributaries. Co-Permittee Town of Barre will be responsible for the maintenance of the new stormwater infrastructure. Pending (Comment Period) Barre Town No 05-26-2025 06-16-2025
6F0033-6 Minor Bellows Free Academy; Bellows Free Academy; 75 Hunt Street Redevelopment of an existing gravel parking area and tennis courts into a new 55-space parking lot on the south side of Hunt Street on the existing high school property. Permit Fairfax Yes 05-26-2025 05-15-2025
6F0034-4 Minor Malone 75 Swanton Road Properties; Malone 75 Swanton Road Properties, LLC; 75 Swanton Road (1) subdivision of existing ±4.67-acre “Parcel II” into Lot A ±1.75 acres and Lot B ±2.92 acres and (2) construction of a ±2,450 square-foot Starbucks restaurant upon Lot A with a drive-thru and outdoor patio, and associated parking, landscaping, utility, and stormwater improvements. The Project is approved for access from Franklin Park West only. Permit Saint Albans Town Yes 05-26-2025 05-01-2025
7C0432-20-1 Minor Charles and Kathy Fenoff; Charles Fenoff; Kathy Fenoff; 1323 Industrial Parkway 20' X 80' addition Permit Saint Johnsbury Yes 05-26-2025 05-19-2025
7C0678-6 Minor Colby Martino NE Storage LLC; Colby Martino NE Storage LLC; 5040 Memorial Dr. Construction of two (additional) self-storage buildings (20’x100’ and 20’x105’), unheated and without plumbing. Permit Lyndon Yes 05-19-2025 08-13-2024
7C0980-4 Minor Martin & Catherine Beattie Martin & Catherine Beattie Trust; Martin & Catherine Beattie Martin & Catherine Beattie Trust; 421 VT Route 2 Proposed building addition to existing Marty's 1st Stop convenience store, including associated site improvements. No changes to existing fuel stations. No changes to existing access to Route 2. Pending (Comment Period) Danville No 06-02-2025 06-16-2025
7E0096-1 Minor todd lambert; todd lambert; todd lambert; todd lambert; songbird drive The Project would: (a) subdivide an approximately 36-acre, two-lot tract of land into Lot 1 of 7.6 acres, Lot 1A of 5.19 acres, Lot 2 of 13.9 acres, Lot 2B of 4.1 acres, and Lot 2C of 4.55 acres; and (b) construct and/or maintain the following existing and proposed improvements on each lot: one existing single-family dwelling and associated improvements on Lot 2; one single-family dwelling or one pad site for one recreational vehicle and associated improvements on Lot 1A; one single-family dwelling or one pad site for one recreational vehicle and associated improvements on Lot 2B; and one single-family dwelling or one pad site for one recreational vehicle and associated improvements on Lot 2C. Pending (Comment Period) Canaan No 05-26-2025 06-11-2025
7R1158 Minor Conrad & Francoise Fauteux; RTE 114 CREATE GRAVEL PARKING AREA APPX 1 A IN SIZE ON A 2.2 A FOR TEMPORRY PARKING OF BOX TRAILERS WAITING FOR AUTORIZATION TO CROSS THE BORDER TO CANADA Dismissed Norton Yes 05-26-2025
7R1368-1 Minor BRENNAN LEFEBVRE; BRENNAN LEFEBVRE; 3869 ROUTE 105 The project consists of amending permit 7R1368 to approve the construction of a new garage and to replace an existing mobile home with a new single-family residence. The new garage was constructed in 2020 without obtaining permit approval. The garage is 24' x 36' stick built with red metal siding and black metal roofing. The existing mobile home will be demolished and disposed. A new stick built single family dwelling will be constructed with black vinyl siding and black metal roofing. The new residence will utilize all existing utilities. Pending (Comment Period) Derby No 05-19-2025 06-05-2025
8B0559-3 Minor Daniel Skoglund Maple Street Foundation, Inc.; Maple Street Foundation, Inc.; 322 Maple Street This project is generally described as the construction of four single-story additions to an existing private school (a 9,200-sf addition and three small additions totaling approximately 500-sf) and additional courtyard space. The school capacity will be 160 students and 30 employees. Pending (Comment Period) Manchester No 05-19-2025 06-04-2025
9A0324-1 Minor Adam Thomas Thomas North Street, LLC; Thomas North Street, LLC; North Meadow Drive (SPAN: 093-029-11844) This permit specifically authorizes construction of a 6-unit residential Planned Unit Development upon a ±9.06-acre undeveloped parcel. The project includes: (a) construction of two duplex buildings (Units #1 - #4) with access from North Street via an existing shared drive to be improved to a private road and (b) construction of two single-family dwellings (Units #5 & #6) with access from North Meadow Drive and a proposed shared drive. All six units will be served by on-site wastewater disposal systems and connections to the Town of Bristol municipal water system. The project is located off North Meadow Drive in Bristol, Vermont (SPAN: 093-029-11844). Permit Bristol Yes 05-26-2025 04-30-2025