Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Missisquoi

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 65    Segment ID: R47-    Stream Name: Missisquoi River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 11 None No
7.2 Channel Aggradation 13 None No
7.3 Widening Channel 11 None No
7.4 Change in Planform 4 None No
  Total Score 39  
  Condition Rating 0.49  
7.5 Channel Evolution Model F  
  Channel Evolution Stage I  
7.6 Geomorphic Stream Condition Fair  
7.7 Stream Sensitivity Very High  
7.5 Channel Adjustment Processes Narrative  
  Active widening and planform change. There is an active headcut in an agricultural setting at the upper end of this reach. The channel has been excavated in this area and the degradation feature is not typical for the reach. The area about the excavation has not incised at this time. CEM of Stage 1 currently, area of head cut could change and should be watched.