Record: 17    Segment ID: T2.01-    Stream Name: Mad Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 7 E To C Yes
7.2 Channel Aggradation 11 None No
7.3 Widening Channel 12 Other Yes
7.4 Change in Planform 9 Other Yes
  Total Score 39  
  Condition Rating 0.49  
7.5 Channel Evolution Model F  
  Channel Evolution Stage III  
7.6 Geomorphic Stream Condition Fair  
7.7 Stream Sensitivity Very High  
7.5 Channel Adjustment Processes Narrative  
  Existing channel keys to C. Reference is listed as C, but should have been an E channel before roadway construction given the slope, valley width, and historical photos.