Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mill Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 15    Segment ID: M12-    Stream Name: main stem

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 8 None No
7.2 Channel Aggradation 14 None No
7.3 Widening Channel 12 No
7.4 Change in Planform 8 No
  Total Score 42  
  Condition Rating 0.52  
7.5 Channel Evolution Model F  
  Channel Evolution Stage III  
7.6 Geomorphic Stream Condition Fair  
7.7 Stream Sensitivity Very High  
7.5 Channel Adjustment Processes Narrative  
  Incising: Some areas are incising and/or widening due to recent straitening and dredging. Other areas are greatly aggraded at bends downstream from the straightened area.