Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Rock River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 10    Segment ID: M09-    Stream Name: Rock River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 12 None Yes
7.2 Channel Aggradation 13 None No
7.3 Widening Channel 15 None No
7.4 Change in Planform 14 None No
  Total Score 54  
  Condition Rating 0.68  
7.5 Channel Evolution Model F  
  Channel Evolution Stage II  
7.6 Geomorphic Stream Condition Good  
7.7 Stream Sensitivity Moderate  
7.5 Channel Adjustment Processes Narrative  
  Channel is moderately incised with minimal opportunity for widening or planform adjustment. Portions of the reach are controlled by ledge. Segmented due to different reference stream type, confinement, and substrate.