Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Black Creek Head

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 3    Segment ID: M06-    Stream Name: Black Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 13 None Yes
7.2 Channel Aggradation 13 None No
7.3 Widening Channel 12 No
7.4 Change in Planform 14 No
  Total Score 52  
  Condition Rating 0.65  
7.5 Channel Evolution Model F  
  Channel Evolution Stage I  
7.6 Geomorphic Stream Condition Good  
7.7 Stream Sensitivity High  
7.5 Channel Adjustment Processes Narrative  
  Minor widening. As consequences, the rip rap downstream from the bridge on the left side is now submerging. Flow alteration such as storm water could potentially contribute to increase the adjustment process.