Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Sunderland Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 3    Segment ID: M02-    Stream Name: Sunderland Main Stem

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 10 None No
7.2 Channel Aggradation 7 None No
7.3 Widening Channel 4 No
7.4 Change in Planform 10 Yes
  Total Score 31  
  Condition Rating 0.39  
7.5 Channel Evolution Model D  
  Channel Evolution Stage IIc  
7.6 Geomorphic Stream Condition Fair  
7.7 Stream Sensitivity Very High  
7.5 Channel Adjustment Processes Narrative  
  Like downstream reach, channel is experiencing aggradation and much scour on lateral banks. Herbaceous vegetation and historically straightened channel has kept channel from extensive widening.