Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mad River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 31    Segment ID: T12.02-    Stream Name: Lincoln Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 13 None Yes
7.2 Channel Aggradation 11 None No
7.3 Widening Channel 11 No
7.4 Change in Planform 10 No
  Total Score 45  
  Condition Rating 0.56  
7.5 Channel Evolution Model F  
  Channel Evolution Stage IV  
7.6 Geomorphic Stream Condition Fair  
7.7 Stream Sensitivity High  
7.5 Channel Adjustment Processes Narrative  
  Aggradation and planform change following the 1998 flood. See step 5 for further narrative.