Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mad River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 9    Segment ID: M11-    Stream Name: Mad River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 13 None No
7.2 Channel Aggradation 12 None No
7.3 Widening Channel 11 No
7.4 Change in Planform 9 No
  Total Score 45  
  Condition Rating 0.56  
7.5 Channel Evolution Model F  
  Channel Evolution Stage III  
7.6 Geomorphic Stream Condition Fair  
7.7 Stream Sensitivity Very High  
7.5 Channel Adjustment Processes Narrative