Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - First Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 39    Segment ID: M19-    Stream Name: First Branch of the White River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Confined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 9 C to B Yes
7.2 Channel Aggradation 10 None No
7.3 Widening Channel 11 None No
7.4 Change in Planform 10 None No
  Total Score 40  
  Condition Rating 0.50  
7.5 Channel Evolution Model F  
  Channel Evolution Stage III  
7.6 Geomorphic Stream Condition Fair  
7.7 Stream Sensitivity High  
7.5 Channel Adjustment Processes Narrative  
  Minor to major aggradation following historic incision; planform evolution limited by extensive riprap.Borderline Cb stream rather than B to begin with; heavy encroachment of Rte 110 and consequent incision restrict floodplain enough to push to C to B stream type departure. History of beaver dam blow-outs US contributes to flow alterations.