Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 15    Segment ID: M07-    Stream Name: Battenkill River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 14 None Yes
7.2 Channel Aggradation 15 None No
7.3 Widening Channel 15 No
7.4 Change in Planform 17 No
  Total Score 61  
  Condition Rating 0.76  
7.5 Channel Evolution Model F  
  Channel Evolution Stage III  
7.6 Geomorphic Stream Condition Good  
7.7 Stream Sensitivity High  
7.5 Channel Adjustment Processes Narrative  
  Natural meanders remain in Stage 1 with straightened stretches in Stage 3. Single meander in center of straightened reach at downstream end of reach may be "break out"/attenuation point or where former meander reoccupied in response to straightening