Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 12    Segment ID: M05-    Stream Name: Battenkill River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 17 None No
7.2 Channel Aggradation 15 None No
7.3 Widening Channel 17 No
7.4 Change in Planform 14 No
  Total Score 63  
  Condition Rating 0.79  
7.5 Channel Evolution Model F  
  Channel Evolution Stage I  
7.6 Geomorphic Stream Condition Good  
7.7 Stream Sensitivity High  
7.5 Channel Adjustment Processes Narrative  
  Largely unaltered meandering channel with access to floodplain.