Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mettowee River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 40    Segment ID: M10-    Stream Name: Mettowee River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 5 C to F Yes
7.2 Channel Aggradation 13 None No
7.3 Widening Channel 8 No
7.4 Change in Planform 13 Yes
  Total Score 39  
  Condition Rating 0.49  
7.5 Channel Evolution Model F  
  Channel Evolution Stage II  
7.6 Geomorphic Stream Condition Fair  
7.7 Stream Sensitivity Extreme  
7.5 Channel Adjustment Processes Narrative  
  Minor but active widening in response to historic channelization and berming. Channel is entrenched with undercut banks and leaning trees. Widening possibly moderated by mature tree buffers (of narrow width) on both banks.