Williams River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 32    Segment ID: T5.09-    Stream Name: Middle Branch Williams River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 7 B to F Yes
7.2 Channel Aggradation 14 None No
7.3 Widening Channel 12 None No
7.4 Change in Planform 12 None Yes
  Total Score 45  
  Condition Rating 0.56  
7.5 Channel Evolution Model F  
  Channel Evolution Stage II  
7.6 Geomorphic Stream Condition Fair  
7.7 Stream Sensitivity Extreme  
7.5 Channel Adjustment Processes Narrative  
  This segment is heavily encroached and straightened along Rt-11. The channel is pinned against the road embankment and has limited opportunity to redevelop meanders as the opposite bank is steep with intermittent armoring. As the incision ratio indicates this segment is locked in stage II due to the encroachment and armoring throughout causing a departure from B to F-type. There is a short portion where the river is able to meander, which was filled with deposition during T.S. Irene and now is adjusting planform. This stretch however was not long enough to warrant segmentation as the majority of the segment is still pinned against the road and incising.