Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Williams River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 16    Segment ID: M19-    Stream Name: Williams River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 5 C to F Yes
7.2 Channel Aggradation 14 None No
7.3 Widening Channel 11 None No
7.4 Change in Planform 15 None No
  Total Score 45  
  Condition Rating 0.56  
7.5 Channel Evolution Model F  
  Channel Evolution Stage II  
7.6 Geomorphic Stream Condition Fair  
7.7 Stream Sensitivity Extreme  
7.5 Channel Adjustment Processes Narrative  
  M19.B is influenced by the encroachment of Smokeshire Rd through most of the segment. This encroachment changed the confinement type and caused the channel bottom to incise to bedrock throughout the segment, causing a departure from C to F. Bedrock and bank armoring limit the opportunity for widening and planform adjustment so this segment is likely stuck in Stage II.