Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mill Brook - Basin 13

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 9    Segment ID: M08-    Stream Name: Mill Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Confined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 13 None No
7.2 Channel Aggradation 6 None No
7.3 Widening Channel 10 None No
7.4 Change in Planform 12 None No
  Total Score 41  
  Condition Rating 0.51  
7.5 Channel Evolution Model F  
  Channel Evolution Stage II  
7.6 Geomorphic Stream Condition Fair  
7.7 Stream Sensitivity High  
7.5 Channel Adjustment Processes Narrative  
  This reach scoured down during T.S. Irene in the upper reach and widened in the lower reach where multiple grade controls limited incision. Floodplain access is very limited throughout the reach and large mass failures were observed in the areas of widening. The upper half of the reach is naturally confined and is incised. A small ~5ft wide bench is the only accessible floodplain except during the largest events. Heavy bank scour was observed through most of the reach but widening is limited by stony soils, ledge, and dense roots. We assessed the reach as stage II due to the very high primary floodplain and the low potential for widening or planform adjustment.