Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Otter Creek

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 16    Segment ID: M28-    Stream Name: Upper Otter Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

NOTE: Enter the Confinement Evaluated first, then the Scores, then the rest.

Rapid Geomorphic Assessment  
  Confinement Evaluated Unconfined  
  Geomorphic Assessment Scores
  Score STD (7.5) Historic (7.5)
7.1 Channel Degradation 5 Other Yes
7.2 Channel Aggradation 15 None No
7.3 Widening Channel 8 No
7.4 Change in Planform 15 No
  Total Score 43  
  Condition Rating 0.54  
7.5 Channel Evolution Model F  
  Channel Evolution Stage I  
7.6 Geomorphic Stream Condition Fair  
7.7 Stream Sensitivity Very High  
7.5 Channel Adjustment Processes Narrative  
  Major channel straightening has caused widening and loss of bedform. Only slight incision. Shift from E to C stream type. Future widening and planform changes expected. Incision not major, stage 1 is best fit, new fldplain development not expected