Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Missisquoi

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 60    Segment ID: R45S3.1S1.01-    Stream Name: Ace Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog


Rapid Habitat Assessment      
RHA Reference Stream Type Braided   Stream Gradient Type
Dominant Bedform Cascade (Phase 1, Step 2.11)  
Habitat Assessment Scores
6.1 Woody Debris Cover 18
6.2 Bed Substrate Cover 10
6.3 Scour and Deposition Features 10
6.4 Channel Morphology 8
6.5 Hydrologic Characteristics 10
6.6 Connectivity 12
  Left Right
6.7 River Banks 8 8
6.8 Riparian Area 9 9
6.9 Total Score 102
  Percentage 64
  Overal Physical Habitat Condition  
  Fair (Major Departure)  
  SHTD Existing Habitat Type No Departure
Legacy Habitat Assessment Scores  
6.1 Epifaunal Substrate - Available Cover
6.2 Pool Substrate
6.3 Pool Variability
6.4 Sediment Deposition
6.5 Channel Flow Status
6.6 Channel Alteration
6.7 Channel Sinuosity
  Left Right
6.8 Bank Stability
6.9 Bank Vegetation Protection
6.10 Riparian Vegetation Zone Width
  Total Score 0
  Condition Rating 0.00
6.11 Habitat Stream Condition
Comments
Braided system.