Comments:
Step 3. Multiple revetments include rip rap and a short section of hard bank at the Cemetery Road crossing.
Encroachment: There is a high level of development which will limit ability of this segment to develop a new floodplain. There could still be some vertical instability, hence the CEM of Stage 2.
|