Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Missisquoi

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 25    Segment ID: R33-    Stream Name: Missisquoi River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 4
  Point Bar 6
  Side Bar 0
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 1
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
Step 2.8: IRraf would be 1.14 without the berm giving better access to the floodplain. IRhef=1.4 resulting in loss of floodplain access. Step 4.6: there is a dam in upstream R34B Step 7: major historic flow alterations reflect berming within the reach as well as the impacts from the upstream dam. Mass failures document in R34A may be source of sediment buildup observed in this reach.