Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

North Branch Winooski

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 48    Segment ID: T2.03-    Stream Name: Minister Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 4
  Side Bar 10
  Diagonal Bar 0
  Delta Bar 8
  Island Bar 5
5.2 Migration Features  
  Flood Chutes 2
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 2
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 428 ft.
  Dredging None

Comments:
A horse farm is located along the upper portion on the right side. It has a poor riparian buffer along the property. A stone dam with a total height of 1.6' was founded on the lower portion of the segment.