Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

North Branch Winooski

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 6    Segment ID: M04-    Stream Name: North Branch Winooski River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 1
  Point Bar 3
  Side Bar 12
  Diagonal Bar 1
  Delta Bar 0
  Island Bar 3
5.2 Migration Features  
  Flood Chutes 7
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 2,042 ft.
  Dredging None

Comments:
Historic straightening evidently by evidenced rip rap. In the upper portion of the reach the straightening is due to the proximity of Route 12 and the lower portion is related with farming practices. The upper 600' of the reach shows a narrower portion of the valley and similar feature of M05. The reach is predominantly a plane bed system.