Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

North Branch Winooski

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 59    Segment ID: T6.01-    Stream Name: Hardwood Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 3
  Side Bar 3
  Diagonal Bar 2
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 3
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 3
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing Yes
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 265 ft.
  Dredging None

Comments:
Signals of beaver activities were founded such inactive dams. The cross section site was not representative of the entire reach based on the evolutionary stage some incision should be capture.