Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Rugg Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 12    Segment ID: M08-    Stream Name: Rugg Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 2
  Side Bar 2
  Diagonal Bar 2
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 2
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 2
  Head Cuts 0
  Tributary Rejuvenation Yes
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 0 ft.
  Dredging None

Comments:
Four parts to segment - incised plane bed, step pool with steeper slopes and some meanders, a 2nd very short incised plane bed, and a meandering section with deposition. Generally good floodplane access. Stream typing quite confusing. Original phase I data suggested a 'B' stream. Initial field visit used very low bankfull indicators, suggesting great incision, but reinforcing the 'B' typing. Later field visit with higher bankfull led to conclusion of an 'E' stream based on data now entered for step 2.