Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Rugg Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 8    Segment ID: M07-    Stream Name: Rugg Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 1
  Point Bar 0
  Side Bar 2
  Diagonal Bar 1
  Delta Bar 0
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 1
  Neck Cutoffs 0
  Channel Avulsions 1
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 2
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
No tribs for rejuvenation. Bridge constriction is just barely narrower than floodprone width. Strong septic smell at Crosby Dr. Diversion structure outlet in middle of segment. Stream type intermediate b/w plane bed and riffle pool.