Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Laplatte

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 22    Segment ID: M13S3.01-    Stream Name: unnamed

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 3
  Point Bar 18
  Side Bar 9
  Diagonal Bar 0
  Delta Bar 1
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 5
  Neck Cutoffs 0
  Channel Avulsions 1
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 3,261 ft.
  Dredging None

Comments:
Channel is incised. A VAST trail crossing down near the confluence with the mainstem has a double culvert, one of which is completely smashed flat. The flow was going under and to the side of that culvert. A ditch on the left bank between the channel and the field has captured half of the flow here. This could be due to an old DJ and avulsion and could also be related to back up from the VAST culverts.