Record: 10    Segment ID: M07-    Stream Name: West Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 6
  Point Bar 0
  Side Bar 16
  Diagonal Bar 0
  Delta Bar 1
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 61 ft.
  Dredging None

Comments:
The valley wall on the right bank was not distinct. The ground gently sloped up for awhile and then got really steep. Bankfull was difficult to identify in the field and the bankfull elevation may be high relative to adjacent cross section (M07-A and M07-D). Phase 2 channel width was used to determine phase 2 confinement type because of the uncertainty associated with reference channel width (see phase 1 step 7).