Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Stevens Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 18    Segment ID: T2.01-    Stream Name: Grice Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 0
  Side Bar 3
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 2
5.2 Migration Features  
  Flood Chutes 2
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 2
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
8/11/06 (see also comments under T2.01A) Returned to Grice Brook after about a week to conduct cross sectios on upstream segment. System here is slightly entrenched, and has access to a wide floodplain. A number of debris jams are causing the river to undergo planform adjustments. This segment is much more sinuous than is indeicated by stream layer in GIS. Upper portion of segment shows reduction in sediment size. Anecdotal evidence suggests floods cross the backs of properties and are creating new scour pools. About six years ago a culvert at the end of Thorpe Ave. was washed away. Planform adjustments do not threaten structures thought they may threaten properties (i.e. lawns).