Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Stevens Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 8    Segment ID: M05-    Stream Name: Stevens Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 0
  Side Bar 0
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 2
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 0 ft.
  Dredging None

Comments:
Debris and beaver dams are pulled from the segment by WWTF staff 2x/yr. Water has flooded buildings at facility to 6"deep. Bankfull for step 2 estimated and could be much higher. Typical profile might be a beaver pond. Pebble count also estimated. Bed definitely dominated by sand and fines. Did not attempt to estimate % debris. Riffles/steps sedimented therefore spacing not evaluated.