Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Poultney - Hubbardton River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 25    Segment ID: M17-    Stream Name: Poultney

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 1
  Point Bar 7
  Side Bar 5
  Diagonal Bar 4
  Delta Bar 1
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 3
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 9
  Head Cuts 0
  Tributary Rejuvenation Yes
5.4 Stream Ford or Animal Crossing Yes
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
Some areas may have been straightened in the past, now it is difficult to determine.