Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Tyler Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 57    Segment ID: T2S1.03-    Stream Name: Unnamed 1 to T2

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 1
  Point Bar 5
  Side Bar 2
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 3
  Neck Cutoffs 0
  Channel Avulsions 1
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 1
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing Yes
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
Variable segment, lower part has C valley, bedrock area is B and sometimes A, upper bit is more B-C before reaching segment T2S1.03B. No incision. Fairly stable except for some planform shifting in wider areas. Aggradation also noticeable. Could be from upstream beaver or planform shifts. Some planform adjustments are historic