Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Millers Run

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 5    Segment ID: T204-    Stream Name: Millers Run

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 0
  Point Bar 0
  Side Bar 0
  Diagonal Bar 0
  Delta Bar 1
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation Yes
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 1,924 ft.
  Dredging Dredging

Comments:
Historic straightening, 2 sets of bridges on Rte122 force stream from one valley wall to another, causing scour and deposition. Riprap by bridge. Ledge at downstream end of segment causing very deep pool = approx. 15'