Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Millers Run

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 4    Segment ID: T204-    Stream Name: Millers Run

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 4
  Point Bar 3
  Side Bar 4
  Diagonal Bar 1
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 2
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 1
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing Yes
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 5,107 ft.
  Dredging None

Comments:
Riprap in most locations failing. x-sec data varied from C to B to F stream types. Used data from c-stream type but using +/- .2 entrenchment option, called it a B. There were small pockets of flooplain access but the entire segment was generally entrenched.