Record: 5    Segment ID: M01-    Stream Name: West Branch Ompompanoosuc

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 3
  Point Bar 1
  Side Bar 3
  Diagonal Bar 2
  Delta Bar 0
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 2
  Neck Cutoffs 0
  Channel Avulsions 1
  Braiding 1
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 3
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 114 ft.
  Dredging None

Comments:
...Segment location description continued from Step 0...but has a split channel. One channel follows the VHD stream layer, while the other extends out to the northeast of the stream layer. The upstream end of the segment is where this smaller channel enters the main channel. The main channel comes straight again. In this reach, we had several "D" braided channels. We did not do a cross section in this segment, but instead used a representative "D" channel cross section that was actually measured in M01-G. The pebble count from M01-G was also used for this segment.