Record: 7    Segment ID: M06-    Stream Name: Postash Brook Mainstem

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 0
  Side Bar 2
  Diagonal Bar 2
  Delta Bar 0
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
Channel through this reach appears to have been historically straightened - possibly due to logging activity in east woods area. Straightening, and increased streamflows from stormwater has caused riffle-pool system to be replaced by plane bed system. Many bars and changes in planform suggest this reach is going through adjustments from historic/current degradation and some current aggradation. Assessed at Stage III but could be somewhere in between II and III.