Record: 10    Segment ID: M08-    Stream Name: Postash Brook Mainstem

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 2
  Side Bar 2
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 1
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
One large debris jam at bottom of reach is causing widening and a flood chute around it. Two areas w/ old bridge abutments constrict the channel. Where these abutments are constricting flow there is aggradation occurring above, and scour and degradation below. Further, more detailed field assessment would be necessary to determine the degree to which the old abutments are affecting the (linear length) of the channel. Removal of structures and active restoration in channel may improve riffle habitat in lower section of reach. Further discussion on this topic is found in the Phase II documenation and summary (separate pdf).