Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Indian Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 3    Segment ID: M03-    Stream Name: Indian Brook Mainstem

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 2
  Side Bar 2
  Diagonal Bar 0
  Delta Bar 2
  Island Bar 1
5.2 Migration Features  
  Flood Chutes 2
  Neck Cutoffs 2
  Channel Avulsions 2
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 2
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
No apparent channel straightening. Channel very sinuous and located down in a steep-side sloped valley. Likely that no historic alterations have occurred here b/c of the setting A very short section of this reach just below Rt. 7 is a cascade with a significant waterfall (grade control). Despite this change in elevation, overall slope of reach is very low which reflects its very low gradient. It was not considered necessary to segment this waterfall since it is a very insignificant portion of the reach. But it it important to note for grade control of both M03 and M04.