Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Sunderland Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 6    Segment ID: M05-    Stream Name: Sunderland Main Stem

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 2
  Side Bar 2
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 3
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening None
  Straightening Length 0 ft.
  Dredging None

Comments:
Reach split by a cascade in the middle of reach - broken into 2 segments which captures information for cascade (segment B) and E-type channel above and below cascade (segment A) Low slope, grass and shrubs dominate valley floor. Sandy bottom, very sinuous. Beaver dam directly upstream of cascade.