Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - Third Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 29    Segment ID: T2.04-    Stream Name: Ayers Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 2
  Point Bar 2
  Side Bar 2
  Diagonal Bar 2
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 8
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 2
  Head Cuts 0
  Tributary Rejuvenation Yes
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 3,671 ft.
  Dredging None

Comments:
Reach historically straighted and likely pushed up against valley wall on left bank. Stream mostly continuous with left valley wall. Right side of reach is mostly hayed field. Failed beaver damn seems to have attenuated and then released large amounts of sediment now working through reach.