Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - Third Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 5    Segment ID: M01-S3.02-    Stream Name: M01-S3 - Camp Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 22
  Point Bar 39
  Side Bar 76
  Diagonal Bar 4
  Delta Bar 7
  Island Bar 2
5.2 Migration Features  
  Flood Chutes 38
  Neck Cutoffs 0
  Channel Avulsions 8
  Braiding 2
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 22
  Head Cuts 0
  Tributary Rejuvenation Yes
5.4 Stream Ford or Animal Crossing Yes
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 2,988 ft.
  Dredging None

Comments:
Very variable- some sections incised, toppling trees; other areas blown out, widened/aggraded. Cross section does not reflect extremes. 300' section of bedrock gorge by Dartt Hill Rd (central portion of segment) is a 12.8 ft bedrock constriction (the bridge here provides no constriction) but was not segmented out due to short length. Additional grade controls (two more near Dartt Hill, one at US end of segment) limit incision and provide some stability for reach as a whole.