Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - Third Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 4    Segment ID: M01-S3.02-    Stream Name: M01-S3 - Camp Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 11
  Point Bar 14
  Side Bar 21
  Diagonal Bar 2
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 8
  Neck Cutoffs 0
  Channel Avulsions 1
  Braiding 3
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 11
  Head Cuts 2
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing Yes
5.5 Channel Alterations  
  Straightening With Windrowing
  Straightening Length 3,267 ft.
  Dredging None

Comments:
Extensive channelization: snagging, dredging, new riprap post-Irene. Significant encroachment from road and houses. Multiple terraces indicate succesive historic incision.