Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mad River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 25    Segment ID: M23-    Stream Name: Mad River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 1
  Point Bar 1
  Side Bar 2
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 0
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 0
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 614 ft.
  Dredging None

Comments:
Reach is more buffered from Route 100 in most places than segment A, and is in a confined setting. Several culverts dump water from tributaries on the west side of Route 100 and bedrock banks and rip-rap prevent any large scale geomorphic processes.