Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - First Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 48    Segment ID: T2.01-    Stream Name: Dickerman Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 8
  Point Bar 15
  Side Bar 11
  Diagonal Bar 7
  Delta Bar 1
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 20
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 2
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing Yes
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 1,765 ft.
  Dredging None

Comments:
Slope is actually 5.4% (subslope a, GIS calc.) but a large percentage of elevation change is concentrated at one waterfall and two other relatively short but steep runs of ledge, so it was given a b subslope. Unusual design of poured concrete bridge, with bend in the middle. Mass failure not that far from structures on LB at 98 Dickerman.