Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - First Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 39    Segment ID: M19-    Stream Name: First Branch of the White River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Channel Bed and Planform Changes  
5.1 Bar Types  
  Mid Bar 5
  Point Bar 6
  Side Bar 6
  Diagonal Bar 0
  Delta Bar 0
  Island Bar 0
5.2 Migration Features  
  Flood Chutes 4
  Neck Cutoffs 0
  Channel Avulsions 0
  Braiding 0
5.3 Steep Riffles and Head Cuts  
  Steep Riffles 1
  Head Cuts 0
  Tributary Rejuvenation No
5.4 Stream Ford or Animal Crossing No
5.5 Channel Alterations  
  Straightening Straightening
  Straightening Length 1,430 ft.
  Dredging None

Comments:
Borderline Cb stream rather than B, but valley is relatively narrow (and suspected to be semi-confined naturally) in this segment, even without the heavy encroachment of Rte 110- encroachment and consequent incision restrict floodplain enough to push to C to B stream type departure. Gravel D50 for substrate and frequent riffle-pool type sediment deposits likely due to inputs from recent breaches of upstream beaver dams as well as gravel inputs from heavy road encroachment; suspect reference is cobble.